Go To Search
HomeEmail
RSSPrint
Help Center

Home

Posted on: August 20, 2019

Request for Proposals to Construct Highland Road Trail

The Town of Cave Creek issues this Request for Proposals for construction of the proposed HIGHLAND ROAD TRAIL- 4 ft. wide x 1.6 miles long. The expected project time for this engagement is expected to be approximately 3-6 months starting perhaps as early as November 2019, with a project completion date to be no later than June 30, 2020. The firm or individual must have the required capabilities and an in-depth understanding and working knowledge of the Town of Cave Creek’s Technical Design Guideline-Number 5 Trails. Click http://www.cavecreek.org/DocumentCenter/View/3016 for document.

The proposed Highland Road Trail will be located on either side of the Highland Road right-of-way, (Highland Road) within the Town of Cave Creek. The width of the proposed trail will be approximately 4 ft. wide and 1.6 miles long and will potentially cross over the paved surface of Highland Road 3 - 4 times. These crossings will be determined in the field, starting at the very east end of Highland Road at approximately 75th Street on the north side. The trail will continue on the north side of Highland Road to approximately 67th Street, then will cross to the south side of Highland Road. The trail will continue on the south side of Highland Road, traveling west to the end of Highland Road. Due to topography, a possible crossing may be required back over to the north side of Highland Road in order to provide safe connectivity to the existing School House Road trail. This
will be determined in the field. The end result of the proposed trail will provide an east-west crossing at the intersection of Highland Road and School House Road that connects to the “existing” School House Road Trail. See Aerial Exhibit B.

The proposed Highland Road Trail is identified as a Neighborhood Connector Trail (local trail) as noted in the–“Trail Classification – Standards Table” of the Town of Cave Creek’s Technical Design Guidelines-Number 5-Trails. Exhibit A.

The Town will provide the surveying, traffic control during the construction period, and the removal of any debris resulting from the construction project. The contractor will work closely with Town Staff to schedule and coordinate timing of traffic control and debris removal. 

Competitive proposals for the services specified in this notice will be received by the
Town of Cave Creek at the above specified location until the time and date cited. Proposals must be in the actual possession of the Town of Cave Creek on or prior to the exact time and date indicated above. Late proposals will not be considered. The preparation of the RFP response will be at the expense of the 2 respondent. The Town will not reimburse the respondent for any costs associated with the preparation or submission of any proposal. All RFP responses become the sole property of the Town of Cave Creek.
Additional Info...
Facebook Twitter Google Plus Email